An update about the collapsed transmissi ... / 2012-04-11

2012-04-11 An update about the collapsed transmissi ... 7 years ago
An update about the collapsed transmission tower/mast collapse in Hoogersmilde:

The concrete tower part of the transmission tower at Hoogersmilde has been repaired and parts for the new lattice mast that will be on top are coming in to the construction site. Radio-tv-nederland has all the pictures and updates for the rebuilding process of the Hoogersmilde transmitter.

And last night the FM radio transmitters at Lopik were brought back to full power after repairs because of the damage to the transmitter in a small fire on that same 15 July 2011.

Via Radio-tv-Nederland

Tags: , , ,

, reachable as koos+website@idefix.net. PGP encrypted e-mail preferred.

PGP key 5BA9 368B E6F3 34E4 local copy PGP key 5BA9 368B E6F3 34E4 via keyservers pgp key statistics for 0x5BA9368BE6F334E4 Koos van den Hout
RSS
Other webprojects: Camp Wireless, wireless Internet access at campsites, The Virtual Bookcase, book reviews
This page generated in 0.003945 seconds.