Building my own balun, part 3: First work on the case / 2018-04-04

2018-04-04 Building my own balun, part 3: First work on the case 2 weeks ago
Balun project case Balun project case The first work on the balun case was placing the SO239 socket. This included drilling a hole in the case of the right size and at the right position. Figuring out where to put it was mostly influenced by the fact that the ferrite core has to be placed inside the case and I wanted the SO239 socket, the ferrite core and the output terminals not all jammed together. So the SO239 socket was not going to be in the center. For this my new caliper was a useful tool and I measured the inside size and the wanted location of the socket. And I figured out I could drill a 16mm hole and the SO239 socket would fit inside while leaving enough room for the mounting flange.

Holes were drilled and things worked out fine, so the SO239 socket is now mounted. After checking the future location I realized I will have to mount the balun with the SO239 socket facing downwards because the antenna cable is quite heavy. This has to be taken into account with the next steps.

Other parts of this project:

Tags: , ,

, reachable as koos+website@idefix.net. PGP encrypted e-mail preferred.

PGP key 5BA9 368B E6F3 34E4 local copy PGP key 5BA9 368B E6F3 34E4 via keyservers pgp key statistics for 0x5BA9368BE6F334E4 Koos van den Hout
RSS
Other webprojects: Camp Wireless, wireless Internet access at campsites, The Virtual Bookcase, book reviews, Weather maps
This page generated in 0.008299 seconds.